深埋硬质围岩引水隧洞光面爆破参数优化与施工技术

Optimization of Smooth Blasting Parameters and Construction Technology for Deep-buried Hard Rock Water Diversion Tunnels

  • 摘要: 针对引水隧洞深埋硬质围岩高地应力、轮廓精度要求严苛、传统光面爆破易出现超欠挖与围岩损伤的问题,本研究以某引水隧洞Ⅱ类变质砂岩硬质围岩为工程依托,构建双周边孔爆破数值模型,分析装药空气间隔对孔间成缝效果与围岩径向损伤的影响规律,确定450 mm为最优空气间隔,此时成缝效果与围岩保护达到最佳平衡,岩体损伤范围约17 cm。基于上述参数,构建“分层控制、动态适配”光面爆破技术体系,配套差异化装药结构、数码电子雷管微差起爆网络及全流程质量管控措施,并开展200 m现场试验验证。结果表明:轮廓质量方面,平均线性超挖降低21.6%、局部欠挖降低44.8%,炮孔残痕率与利用率均提升7%;围岩稳定与施工效率方面,炸药单耗降低16.7%,月开挖进尺提高25%,实现了轮廓质量、围岩稳定与施工效率的协同提升。研究成果可为深埋硬质围岩引水隧洞光面爆破设计与施工提供技术参考。

     

    Abstract: To address the problems of high ground stress, stringent contour precision requirements, and the proneness of traditional smooth blasting to over-break, under-break, and surrounding rock damage in deep-buried hard rock water diversion tunnels, a Class II metamorphic sandstone hard rock water diversion tunnel was taken as the engineering background in this study. A numerical model of double peripheral borehole blasting was established to analyze the influence of air-decking on inter-hole fracture formation and radial surrounding rock damage. The results showed that 450 mm was determined as the optimal air-decking, at which the best balance between fracture formation and surrounding rock protection was achieved, and the rock mass damage range was approximately 17 cm. Based on the above parameters, a “layered control, dynamic adaptation” smooth blasting technology system was constructed, which incorporated differentiated charge structures, a digital electronic detonator millisecond-delay initiation network, and full-process quality control measures, and a 200 m field test was carried out for validation. The results show that: in terms of contour quality, the average linear over-break is reduced by 21.6%, the local under-break is reduced by 44.8%, and both the borehole trace rate and utilization rate are increased by 7%; in terms of surrounding rock stability and construction efficiency, the explosive unit consumption is reduced by 16.7%, and the monthly excavation footage is increased by 25%, which achieves synergistic improvement in contour quality, surrounding rock stability, and construction efficiency. The research results can provide technical reference for the design and construction of smooth blasting in deep-buried hard rock water diversion tunnels.

     

/

返回文章
返回