高级检索

冲刷作用对双塔中央索面PC斜拉桥地震响应的影响

Influences of Scouring Action on Seismic Responses of Double-tower PC Cable-stayed Bridge with Central Cable Plane

  • 摘要: 双塔中央索面PC(prestressed concrete)斜拉桥广泛应用于交通量日益增长且桥下设墩受限严重的经济发达区域。由于该类桥梁的主梁宽高比较大,对其开展抗震性能的研究尤为重要。为了研究冲刷作用对该类斜拉桥地震响应的影响,以主跨400 m的某大桥为例,采用SAP2000软件建立该桥空间有限元模型,分析该桥基础在考虑河水冲刷和不考虑河水冲刷两种情况下的地震响应。结果表明:主塔关键截面轴力和剪力的地震响应几乎不受冲刷影响,但冲刷对主塔关键截面弯矩的地震响应有一定影响;冲刷对主塔塔顶位移、主梁梁端位移以及塔、梁端的相对位移的地震响应的影响均较小。

     

    Abstract: The double-tower central span PC(prestressed concrete)cable-stayed bridge is usually used in economically developed regions with increasing traffic volume and limited condition for setting pier. However, the height-towidth ratio of the main beam of these bridges is quite large, and the research on seismic performance of this kinds of bridges is particularly important. In order to study the influences of the souring effect on seismic responses of this kind of cable-stayed bridge, taking a bridge with 400 m main section as an example, by using software SAP2000, the finite element model of the bridge was established to analyze the seismic response of the foundation of bridge under the condition of considering river water erosion and without considering river water erosion. The result shows that the axial force and shear force of the main tower critical section are almost unaffected by the scouring, but have a certain influence on the bending moment of the section; the effects of the scouring on the seismic response of the top displacement of the tower, the displacement of the main beam end and the relative displacement of the tower and beam ends are small.

     

/

返回文章
返回